Quick guide: install your EV charger in 3 steps

Installing an electric car charging point at home has never been so easy. With this step-by-step guide to electric car charging point installation, you’ll discover everything from choosing your Wallbox to the technical requirements and Plan MOVES III grants. Get ready to have your EV charger at home working at 100%.


2. How to choose your EV charger

Charger types

  • Single-phase (up to 7.4 kW)
    Ideal for most homes that do not need ultra-fast charging. Enough to recharge for 100 km of range in 5–6 hours.
  • Three-phase (11–22 kW)
    For demanding users (fleets, communal garages) or vehicles with three-phase charging. Enables much faster charging.

Charging modes

  • Mode 2 (Schuko socket)
    Very practical for emergencies, but slow and not recommended for daily use.
  • Mode 3 (Wallbox)
    Type 2 connector, power management and integrated protection: the safest and most versatile option.

Key features

  1. Power management: dynamic adjustment to match charging to your household consumption.
  2. Connectivity: Wi-Fi or Ethernet for remote control via an app.
  3. Protection: Type A + SI/EV RCD, integrated miniature circuit breakers.
  4. Integrated cable vs. socket: weigh convenience against flexibility.

3. Technical installation requirements

  1. Consumer unit
    • Free space to add the Wallbox protection modules.
    • Install a line miniature circuit breaker and a Type A + SI/EV RCD.
  2. Cable cross-section
    • Single-phase 32 A → 6 mm².
    • Three-phase 32 A → 10 mm².
  3. Earthing
    • Resistance ≤ 100 Ω.
    • Automatic earthing terminals if required by the cable containment system.
  4. Supply connection and power
    • Check with the distribution network operator that the contracted power can cover the additional demand.
    • Apply for an increase in contracted power if necessary.

4. Plan MOVES III grants

  • Grant coverage: up to 70% of the cost of the Wallbox and installation (depending on the autonomous community).
  • Who can apply: individuals, SMEs and self-employed people who are tax-resident in Spain.
  • Common requirements:
    • Be up to date with the Tax Agency and Social Security payments.
    • In some cases, scrap an old vehicle.
  • How to apply:
    1. Register the project on the autonomous community’s portal.
    2. Wait for the grant decision.
    3. Carry out the installation and pay the invoices.
    4. Submit supporting documents and receive the grant.

5. Step-by-step installation process

  1. Technical visit
    We measure distances, assess the existing consumer unit and recommend the best location for the Wallbox.
  2. Preparing the consumer unit
    We install the protective devices (miniature circuit breaker, Type A + SI/EV RCD).
  3. Cable installation
    Cable containment from the consumer unit to the charging point, using conductors with the appropriate cross-section.
  4. Wallbox installation
    Mechanical fixing and connection of the phase, neutral and earth in accordance with the manufacturer’s catalogue.
  5. Configuration and commissioning
    We set the maximum power, connectivity (Wi-Fi/Ethernet) and charging parameters.
  6. Final tests
    We check voltages and currents, test that protective devices trip correctly, and carry out a test charging cycle.

REAL-LIFE CASES

Visit our Instagram page to see the installations we carry out every day.

We use essential technologies to operate this website and remember your choices. Optional analytics will only be enabled with your permission. You can refuse them and continue browsing.

Cookie policy

Hola, soy Inma.

Asistente virtual de Inmatelec

Ir al formulario de contacto

No incluyas datos personales en el chat. El equipo revisará la viabilidad y el presupuesto.

WhatsApp